A distributor evaluates a supplier three times: at the sample, at the quotation, and at the first warranty claim. The third evaluation is the one that decides whether the program makes money, and it is the one that nobody prepares for.
The reason is structural. Equipment arrives in containers on a predictable schedule, priced in a quotation that everybody has read. Spare parts arrive one at a time, over years, priced from whatever the supplier says on the day — and each one is attached to an unhappy end user, a service technician standing on site, and a distributor who has already been paid for the equipment. A program with good margins and a bad parts system loses money quietly.
This is an audit you can run as a distributor, before the first order.
What the audit is actually testing
Four questions, in order of how much damage a bad answer causes:
- Can the supplier tell you which parts fail? A supplier who has shipped the product for years has field data. A supplier who cannot name the five most-replaced components has either not shipped much, or is not looking.
- Can they document how a part is identified? Model-level exploded diagrams, part numbers that survive a product revision, and a parts list that matches the unit on the floor.
- Can they commit to a spare-parts lead time separately from a unit lead time? A four-week unit lead time and a ten-week parts lead time is a warranty problem that arrives later.
- Do they have a written warranty and claim process? Who pays the freight on a warranty part, who authorises the replacement, and what happens when the same unit fails twice.
Everything below is the evidence for those four answers.
The documents to ask for
Ask for these before the first purchase order, and treat “we can send it later” as an answer in itself:
- Exploded parts diagrams by model, with part numbers and quantities per assembly.
- A recommended spare-parts kit for the first container, and an opinion on what a distributor should stock locally versus order as needed.
- Installation and service manuals with fault codes, wiring diagrams and commissioning steps — in the languages required in your market.
- A component-level list identifying proprietary parts: compressors, motors, controllers, valves, boards. These are the parts with long lead times and single sources, and they are where the audit pays for itself.
- Controller firmware and version history. If a board is revised silently, the spare you stock may not match the unit it is going into.
- Failure-rate or return data if the supplier will share it, even at a summary level.
What a weak parts system looks like
The pattern is consistent, and it is visible from the outside:
| Signal | What it usually means |
|---|---|
| “We can supply any part, just tell us the model” | No parts list exists; every order is a special |
| No exploded diagrams | Identification depends on photographs and memory |
| Spare parts priced per conversation | No price list, so your customer’s quote is unpredictable |
| Unit lead time quoted, parts lead time not quoted | Parts are made from leftover production, not planned |
| Controller revisions with no version tracking | Stocked spares will mismatch the field |
| Warranty claim process described verbally only | Freight and authorisation disputes, at your cost |
| Parts shipped without labelling or packaging fit for resale | You will repackage them, or your customer will complain |
None of these are fatal on their own. Together they describe a supplier who is selling equipment rather than supporting a program.
The questions that produce useful answers
These are phrased so that a vague answer is distinguishable from a substantive one.
- Which five components have the highest replacement rate on this product line, and what is the expected life of each?
- Which components are proprietary, and which are available from more than one source?
- What is the standard lead time for a stocked part, and for a non-stocked part?
- What is the minimum order for parts, and how are they shipped?
- What is the warranty period, what does it cover, and who pays inbound and outbound freight on a claim?
- How is a warranty claim submitted, who approves it, and what is the target response time?
- Are parts labelled with the model they fit, and packaged for resale?
- How are engineering changes communicated, and how do we know a part number has changed?
- What documentation exists in our market’s required language?
- If we stock a critical part and it does not move for two years, what does that cost us?
Question 10 is the commercial question and it is deliberately last: the point of the audit is not to stock nothing, it is to know what you are stocking and why.
Building the stocking decision
The output of the audit should be a stock list with a rationale, not a shelf of parts.
- Stock what stops a unit. A compressor or a controller that is unavailable converts a warranty claim into a replacement unit or a refund. That is the most expensive failure mode, so those parts justify carrying cost.
- Order what only inconveniences. Filters, gaskets, fasteners and cosmetic parts can come from the supplier on a predictable lead time.
- Plan for the first season. New installations fail at higher rates in the first months — installation error, commissioning error, transport damage. Stock accordingly for the first heating or cooling season after a launch.
- Track what you actually use. After a year you will know better than the supplier’s list did, and that data is the strongest input into the next negotiation.
Where these questions come from
The audit is not a matter of taste. Most of it maps onto recognised engineering and management practice, which is useful when a supplier asks why you are asking:
- Maintainability is a defined property with its own requirements and study methods (IEC 60706-2), covering access, repair time and diagnostics. A supplier who has never treated maintainability as a design input is unlikely to have the parts documentation either.
- Dependability management (IEC 60300-1) describes how a manufacturer organises reliability and support across the life of a product. A parts system is the part of that which the distributor actually experiences.
- Quality management systems (ISO 9001) require documented information and a corrective-action process — the two mechanisms that turn a field failure into a design change. Worth knowing for 2026 in particular: ISO 9001 was revised with effect from 16 September 2026, so when a supplier tells you it holds ISO 9001, ask which edition. A registration against the 2015 edition is a different statement from one against the 2026 edition, and the question costs nothing to ask.
None of this replaces the parts list. But it tells you how to read the answers: a supplier running maintainability and dependability processes produces the documents without being chased, and the first container is a much quieter experience.
What this looks like in writing
Ask for the parts commitment as a document attached to the supply agreement, covering: the parts list and diagrams, the parts lead times, the spare-parts price basis and how it is revised, the warranty mechanics including freight, the engineering-change notification process, and the documentation languages.
A supplier who is organised will produce that document quickly, because they already have the material. A supplier who is not will negotiate the equipment price instead — which is, in itself, the audit result.
Our parts range is indexed on the products overview — hydronic components such as the magnetic filter and mixing centres and manifolds, the EC inline duct fans, and controls including the smart thermostat range. If you are assembling a first-container parts list, the RFQ channel is where to put the model list and the market so the documentation set can be quoted with the equipment.