This is the guide the rest of our ventilation content hangs off. The individual articles each answer one question in depth; this page is about the thing that actually determines whether a house works — how ventilation, humidity, distribution and filtration interact, and where a Canadian installation usually goes wrong.
In this guide
The deep dives (each opens in its own page):
- ERV vs HRV: Choosing for Canadian Winters — what each recovers, and why the house decides
- Whole-House Dehumidifier Sizing — reading the PPD table at the right test condition
- Zoning Systems for Forced-Air Homes — design basics for part-load comfort
- PIR Pre-Insulated Duct vs Galvanized — the duct assembly as a system component
- Air Outlets: Jet, Slot, Swirl and Grille — selecting the last two metres of the system
The sections on this page: the system view · why Canadian houses need mechanical ventilation · the four complaints · the sizing chain · humidity · distribution and zoning · duct material · what to demand
The system, not the box
A ventilation product is a fan, a core and two ports. A ventilation system is four functions that have to be designed together:
- Dilution and removal — bringing outdoor air in and stale air out, at the rate the house needs.
- Humidity management — adding moisture in a dry winter house, or removing it in a humid summer one. These are opposite requirements, and they can exist in the same house in different seasons.
- Distribution — getting the air to the rooms people occupy, not just into the building.
- Filtration — removing what the first three functions do not.
Most residential failures are a mismatch between these four, not a defective product. A correctly sized ventilator delivering its air to one end of the house has not solved the problem it was installed for, and Health Canada’s ventilation guidance makes that point directly: ventilation air needs to be delivered to occupied rooms, and the system has to be designed and operated to achieve it.
Why Canadian houses need mechanical ventilation
Canadian houses became airtight faster than they became well-ventilated. Reducing heat loss reduced unintentional air exchange at the same time, and passive ventilation stopped being sufficient — which is why building codes now require some form of mechanical ventilation.
The practical consequences for a specification:
- Airtightness changes the answer. A house tested at 1.5 ACH50 and a house at 5 ACH50 with the same floor area do not need the same ventilation rate, and they certainly do not need the same distribution provisions.
- Stack effect does a lot of the work in winter and almost none in shoulder season. A system sized on winter behaviour alone will under-ventilate in October and April, when the temperature difference that drives infiltration is small.
- Exhaust-only is the most common arrangement in existing Canadian houses, and it has a structural weakness: replacement air enters through unintended paths — cracks, wall cavities, and sometimes soil gas pathways — and the system depressurises the house while it runs. That is not an argument against bathroom and kitchen exhaust; it is an argument for a balanced system when whole-house ventilation is the goal.
The four complaints that trace back to design
Almost every residential IAQ complaint is one of these four. Each has a different cause, and misdiagnosing one as another is how money gets spent twice.
| The complaint | What it usually is | What it is not |
|---|---|---|
| “The house feels stuffy” | Under-ventilation: rate too low, or the system runs intermittently and nobody operates it | A filter problem, usually |
| “The air is too dry in winter” | Ventilation with no moisture recovery, plus envelope leakage; dry outdoor air in January carries very little absolute humidity | A humidifier being broken |
| “Condensation on the windows” | Local surface temperature plus indoor humidity — often cold glass in a house that is also dry overall | Proof that the house is over-ventilated |
| “The bedroom is stale but the hallway is fine” | Distribution: closed doors with no transfer path, and fresh air that never reaches the room | A fan sizing problem |
Two of those are worth dwelling on. “Too dry” and “condensation” can both be true in the same house at the same time, because humidity is not uniform: a bedroom with the door closed behaves differently from a living room, and a poorly insulated window corner behaves differently from a wall. Chasing a single whole-house number is the most common error in this category.
And the stale bedroom is a distribution problem that no amount of extra fan capacity fixes. The air has to be able to get there and back out again; a transfer path is part of the design.
The sizing chain
Sizing is a chain with four links. A weak link at any point is where the system fails, and the failure appears at the last link — which is why the wrong component often gets blamed.
- The required ventilation rate. In Canada this is commonly derived from ASHRAE Standard 62.2 for low-rise residential, from CAN/CSA F326 for residential mechanical ventilation systems, and from the National Building Code as adopted provincially. Local requirements vary and may be stricter than the model codes.
- The equipment. A ventilator’s rating is an airflow at a stated static pressure, with a recovery efficiency at a stated temperature. All three numbers are needed; two out of three is marketing. Look for ratings against recognised programmes rather than a figure with no basis.
- The distribution. Duct sizing, outlet selection and transfer paths. This is where “the unit is fine but the rooms are not” comes from — see the air outlets guide.
- The control. A ventilation system that depends on an occupant remembering to operate it will not deliver its rated performance over a year. Interlocking with the furnace circulation fan, or a controller with an outdoor-temperature lockout, is what turns the design into something that happens every day.
Humidity: the part that is seasonal
Humidity is where a single-season decision goes wrong, because the requirement inverts.
- Winter is a moisture-supply question. Outdoor air at −20 °C carries almost no moisture, and heating it drops the relative humidity further. Whether the house needs moisture added or retained depends on the occupants, the envelope and the measured indoor humidity — not on house age.
- Summer is a moisture-removal question, and it is not the same equipment. A ventilator with moisture transfer can temper incoming humidity; it does not dehumidify a house. Where the complaint is a damp basement in July, the answer is usually dehumidification — see whole-house dehumidifier sizing.
The decision sequence that avoids the trap: measure winter indoor relative humidity, note any window condensation, count moisture sources (occupants, showers, cooking, laundry, any existing humidifier or dehumidifier), and only then decide whether the house needs moisture added, retained or removed. The ERV vs HRV article works through that decision in detail.
Distribution and zoning
Distribution is the least glamorous part of the system and the one that decides whether the design is delivered.
- Pressure balance. A house with more exhaust than supply is under negative pressure; the air it draws in comes from wherever it can. Balanced supply and exhaust, verified at commissioning, is the baseline.
- Transfer paths. Closed rooms need a deliberate path for return air — an undercut, a transfer grille, or a ducted return. Undercuts are legitimate, but they should be sized rather than discovered. Where the partition has an acoustic requirement, the transfer path is part of that requirement.
- Zoning. In a forced-air house, zoning lets the system serve part of the house at a time instead of the whole house at part load. That is a comfort mechanism and a distribution mechanism; it is not a substitute for ventilation. The design basics are in the zoning article.
- Outlets. Throw, pressure drop, noise and free area are the four numbers that decide a selection, and heating mode is where ceiling selections fail. See air outlets.
Duct material and the installed assembly
Ventilation performance is measured at the unit and delivered at the room, and the difference between the two is the duct system: its pressure loss, its leakage, its insulation, and whether it was installed as designed.
The material choice matters for different reasons than it is usually sold on. Pre-insulated PIR panel is a sandwich duct — flame-resistant polyurethane between aluminium foil facings — supplied in 20/25/30 mm thickness with a rated operating range and a thermal conductivity that keeps supply air at temperature through an unconditioned run. Galvanised duct is dimensionally stable in a different way, and its installed performance depends far more on the insulation and sealing work on site. The comparison, including where each one wins, is in the PIR vs galvanised guide.
What to demand before you specify
A ventilation submittal that is actually reviewable carries:
- The required rate and the basis for it (code, standard, or calculation), with the occupancy and floor area it assumes.
- Equipment ratings with their test conditions: airflow at a stated static pressure, recovery efficiency at a stated outdoor temperature, and the standard those ratings follow.
- Defrost strategy in writing, and what happens to net airflow during it.
- Distribution: duct sizing, outlet schedule with the four performance numbers, and the transfer paths.
- Control: what turns the system on, whether it interlocks with the furnace, and any outdoor-temperature lockout.
- Maintenance: filter and core service intervals, and what the occupant is expected to do.
- Documentation language for the market, and the certification mark on the nameplate as it applies in that market.
Where to go next
The equipment side is on our ERV / HRV family page and the whole-house dehumidifier page, with the duct and distribution components on the PIR pre-insulated panel, motorized dampers, diffusers and grilles and EC inline duct fans pages. The system-level hubs are ventilation solutions and indoor air quality, and if you are assembling a package for a specific project, the RFQ channel is where to put the house or building parameters.